04 Sep Nueva sede SIMON
Reforma integral en la que se realizaron trabajos de cimentaciones, se actuó sobre la estructura existente de su antigua fabrica y se realizó una distribución nueva del edificio ...
Reforma integral en la que se realizaron trabajos de cimentaciones, se actuó sobre la estructura existente de su antigua fabrica y se realizó una distribución nueva del edificio ...
Nueva Residencia Geriátrica VALLPAR. Instalaciones integrales (Climatización, Electricidad, inst. Mecánicas y de Comunicaciones y Seguridad). Primera obra de Cataluña con el certificado Passivhaus. ...
Execution of electrical, communication, security and detection, sanitary, fire protection, mechanical, BMS, gas, diesel, and generator installations.. ...
Complete installation and commissioning of all systems across five buildings of Biokit’s new Campus, where we currently provide maintenance. The project includes advanced HVAC, 79 air handling units, thousands of data points, fire detection, high voltage, refrigeration systems for cold rooms, technical gases, natural gas,...
Comprehensive execution of all installations (HVAC, low-voltage electrical systems, fire protection and detection, low-current systems, and sanitation) for a Premium office building with a surface area of 7,500 m², distributed over 18 above-ground floors and 8 underground levels. ...
Implementation of HVAC with 60 MW cooling and 30 MW heating in a 240,000 m² area. LV/MV electrical networks, energy fluid distribution, sanitation, plumbing, fire detection and suppression, CCTV surveillance, telecommunications, solar thermal energy, and BMS, PLC, and SCADA systems for management and control. ...
Installation of chilled and hot water plant for temperature control during primary and malolactic fermentation. HVAC systems in barrel rooms, production areas, bottling, tasting room, and social building. Includes low-voltage electricity, fluid distribution networks, and BMS, PLC, and SCADA systems. ...
Iconic building designed by Herzog & de Meuron. Since 2011, home to the National Museum of Natural Sciences of Catalonia. Installations include HVAC, LV/HV electricity, energy and drainage networks, plumbing, rooftop pool, fire detection and suppression, CCTV, access control, telecommunications, and integrated BMS and SCADA...
46,000 m² university campus with five buildings for teaching and business hosting. Centralized district heating & cooling system with 6,000 kW chillers and 1,600 kW boilers. LV electrical networks, energy fluid distribution, plumbing and water treatment. Advanced control via BMS, PLC, and SCADA. ...
Supply and installation of chilled water and forced ventilation systems in a 28-floor office tower with 10 underground levels, including chillers, fancoils, air renewal and extraction systems, and a centralized control system with energy management. ...