Trigeneration system in one of the leading breweries, using biogas from the plant’s wastewater treatment. Includes a 1,127 kW electrical cogeneration engine, a recovery boiler for 656 kg/h of steam, a 250 kWf absorption chiller, and full energy distribution networks. LV/HV power, integrated SCADA and PLC systems. We...

Agefred has technically supervised the comprehensive installations of the new building, with an area of over 16,000 m² distributed across 4 floors, with cooling, heating, and electrical power capacities of 2,256.00 kW, 2,063.00 kW, and 2,232.96 kW respectively. ...

Adaptation of dining areas and classrooms into an ICU with capacity for 200 beds, including oxygen, vacuum, electrical systems, and voice and data installations. The project was completed in just 8 days to strengthen care in response to COVID-19. ...

The works are based on the “turnkey” construction of a logistics warehouse on the ZAM plot of the ZAL Port (Prat). Includes medium voltage (MV), low voltage (LV), fire extinguishing and detection systems, photovoltaic installation, and plumbing. ...

Implementation of advanced HVAC with 900 kW thermal cooling and heating production, radiant cooling/heating floors, heat recovery ventilation, and occupancy control. Medium voltage electrical supply with generator, LED lighting, soundproofed sanitation, and rainwater reuse. Plumbing installations, fire protection systems, detection, fuel gas, and weak signals...

A 4,300 m² building with magnetic resonance imaging, laboratory, offices, and multipurpose rooms. HVAC systems, cooling and heating, photovoltaic energy, plumbing, medical gases, electrical systems, communications, access control, fire protection, and SCADA management. ...

Installation of two dual-fuel boilers (gas/oil) of 2,000 kW and 4,000 kW, with pre-installation for a third one of 6,000 kW. The system includes primary pumps with frequency converters, five secondary pumps, two plate heat exchangers and a heat recovery circuit from cogeneration and LNG. Gas, oil, heating,...

Supply and installation of chilled water and forced ventilation systems in a 28-floor office tower with 10 underground levels, including chillers, fancoils, air renewal and extraction systems, and a centralized control system with energy management. ...

Full renovation of the PIC (IFAE) data processing center, covering 3,375 m². Work included technical rooms and a complete upgrade of the HVAC system, access points, lighting, pumping units, water networks, low-voltage panels, and both energy and building control systems. ...