Thermal Power Plant

Installation of the heat production systems of the Heating Plant building

Scope of the works

Installation of two dual-fuel boilers (gas/oil) of 2,000 kW and 4,000 kW, with pre-installation for a third one of 6,000 kW. The system includes primary pumps with frequency converters, five secondary pumps, two plate heat exchangers and a heat recovery circuit from cogeneration and LNG. Gas, oil, heating, water treatment systems and a Scada control system were also installed.