Damm – Trigeneration

Damm – Trigeneration

DAMM-TRIGENERATION

INSTALATION DETAILS

Location

El Prat de Llobregat, Barcelona, Spain

Description

Located in one of the most important brewing companies. The installation is a trigeneration from BIOGAS generated in the treatment plant.

Scope of works

Cogeneration engine of 1127 kW power.

Heating system by recovering thermal energy from exhaust gases and from cooling water of the engine jacket of the high temperature circuit.

Steam boiler with engine smokes recovery for a production of 656kg/h at a pressure of 8,5kg/cm2.

Cooling system using absorption machine of BrLi de 250 kWf.

Fluid power distribution networks.

BT/MT Electricity.

Industrial PLC systems and SCADA systems integration.

Client

DAMM S.A.